IC 14-39-1-4.5 — Exception to requirement to obtain a carbon dioxide transmission pipeline certificate of authority
Chapter 1. Eminent Domain for Pipeline Transportation or Underground Storage of Carbon Dioxide
Bills citing this section
Section text
Sec. 4.5. A carbon dioxide transmission pipeline company is not required to obtain a carbon dioxide transmission pipeline certificate of authority under section 4 of this chapter if either of the following applies: (1) The carbon dioxide transmission pipeline to be constructed and operated: (A) begins and ends on the surface property above the storage facility; and (B) does not cross: (i) public property; (ii) a public right-of-way; or (iii) a parcel for which the pipeline company would be required to obtain a right-of-way or easement for the pipeline. (2) The surface property above the storage facility crosses only one (1) or more of the following: (A) An existing private easement. (B) A private right-of-way.
As added by P.L.25-2025, SEC.2. Amended by P.L.213-2025, SEC.133.
Source: official publisher (2026 edition)