Skip to content

IC 8-23-9.5-11 — "Project"

Chapter 9.5. Project Delivery Methods

1 section change

Bills amending this section

Section text

Sec. 11. (a) As used in this chapter, "project" means services provided using a two-phase contract with a CMGC or a PDB for preconstruction services and construction services to design, construct, alter, or repair: (1) a state highway; (2) a limited access facility (as defined in IC 8-23-1.1-27); (3) a public highway (as defined in IC 9-25-2-4); (4) a tollway; (5) a bridge; and (6) a passenger and freight railroad system. (b) The term does not include a passenger railroad system that is operated by a commuter transportation district created by IC 8-5-15.

As added by P.L.60-2023, SEC.2. Amended by P.L.145-2026, SEC.38.

Source: official publisher (2026 edition)

Sections IC 8-23-9.5-11 cites